The City of Niagara Falls uses a pavement information system to determine which streets will be capital improvements in any given year. Pavement conditions, pavement age, traffic volumes, timely maintenance and work are all monitored and ultimately influence the timing and need for road rehabilitation projects.
2023 Budget Year will see 11.5km of roads rehabilitated through the capital programs that include road resurfacing, overlay and restoration programs. That includes 7.2 km of Urban Roads reconstructed and / or resurfaced, and 4.3 km of Rural Roads surface treated. Additionally, 1.4 km of sidewalks and curbs will be replaced.
The streets selected for road improvements have been listed below. The work on each street will take about six to eight weeks from start to finish. Construction will take place in stages and there may be delays between each stage.
Please note that streets could be added to or deleted from the program without prior notice from the City.
Armoury Street
Scope of Work
Between Victoria Ave. and Crysler Ave.
When will the work take place?
Spring / Summer 2023
Associated Project
The following project is associated with this Armoury Street Sewer Separation
Baker Road
Scope of Work
From Willoughby Dr to QEW
When will the work take place?
Spring/Summer 2023
Associated Project
The following project is associated with this 2023 Surface Treatment Program
Brown Road
Scope of Work
From Beachwood Rd to Townline Rd
When will the work take place?
Spring/Summer 2023
Associated Project
The following project is associated with this 2023 Surface Treatment Program
Butler Place
Carlton Avenue
Scope of Work
50 meters North of Dunn Street towards Corwin Crescent to Our Lady of Mount Carmel School
When will the work take place?
Spring/Summer 2023
Associated Project
The following project is associated with this 2023 Surface Treatment Program
Church's Lane
Scope of Work
From St. Paul Avenue to Portage Road
Associated Project
The following project is associated with this 2023 Mill & Pave Program
Cropp Street
Scope of Work
From Dorchester Road to Pettit Avenue
When will the work take place?
Spring / Summer 2023
Associated Project
The following project is associated with this 2023 Asphalt Overlay Program
Empire Place
Garner Road
Scope of Work
From Hendershot Blvd to Beaverdams Rd
When will the work take place?
Spring/Summer 2023
Associated Project
The following project is associated with this 2023 Surface Treatment Program
Heritage Drive
Kalar Road
Loyalist Avenue
North Street
Scope of Work
Between Portage Road and Drummond Road
When will the work take place?
Spring/Summer 2023
Associated Project
The following project is associated with this 2023 Surface Treatment Program
O'neil Street
Scope of Work
From Portage Road to Dorchester Road
When will the work take place?
Spring / Summer 2023
Associated Project
The following project is associated with this 2023 Mill & Pave Program
Ort Road
Scope of Work
From Weaver Rd to Marshall Rd
When will the work take place?
Spring/Summer 2023
Associated Project
The following project is associated with this 2023 Surface Treatment Program
Pettit Avenue
Portage Road
Scope of Work
From Thorold Stone Road to O'Neil Street
When will the work take place?
Spring / Summer 2023
Associated Project
The following project is associated with this 2023 Mill & Pave Program
Ross Street
Scope of Work
The engineering design for sewer separation, watermain replacement and road reconstruction on Ross Street.
When will the work take place?
Summer 2019
Associated Project
The following project is associated with this Ross Street Sewer Separation - Design
Secord Place
St James Avenue
Scope of Work
From Colborne Street to St. John Street
Associated Project
The following project is associated with this 2023 Asphalt Overlay Program
St Peter Avenue
Scope of Work
From Colborne Street to St. John Street
Associated Project
The following project is associated with this 2023 Asphalt Overlay Program
Stamford Green Drive
Scope of Work
From St. Paul Avenue to St. George Avenue
Associated Project
The following project is associated with this 2023 Mill & Pave Program
Victoria Avenue
Scope of Work
Clark Avenue to Stanley Avenue. Design of underground sewer and watermain replacements, full road reconstruction with streetscaping, street furniture and LED street lighting.
Associated Project
The following project is associated with this pin oak
Weinbrenner Road
Scope of Work
From Willoughby Drive to East limit
Associated Project
The following project is associated with this 2023 Asphalt Overlay Program
Willoughby Drive
Scope of Work
From Weinbrenner Rd to Marshall Rd
When will the work take place?
Spring/Summer 2023
Associated Project
The following project is associated with this 2023 Surface Treatment Program
Willoughby Drive
Scope of Work
200 meters south of Weinbrenner Road to Marshall Road
When will the work take place?
Spring/Summer 2023
Associated Project
The following project is associated with this 2023 Surface Treatment Program
Associated Projects
Project | Details |
---|
pin oak | Details |
Garner Road Sanitary Extension Design - Black Forest Cr to Forestview Bv | Details |
Ross Street Sewer Separation - Design | Details |
Asset Management Plan Update | Details |
Forestview Estates Subdivision Sanitary Sewer and Watermain Upsizing | Details |
Beck Road Bridge Replacement | Details |
Drummond Road Improvements | Details |
Main Street Chippawa Road Reconstruction & Storm Sewer Replacement | Details |
Willoughby Drive Reconstruction | Details |
Banting Avenue & Roosevelt Avenue Sanitary Sewer and Watermain Replacement | Details |
Fern Avenue, Marieclaude Avenue & Jordan Avenue Watermain Replacement | Details |
Victoria Avenue Bridge | Details |
Silvertown Area Functional Servicing Assessment Study | Details |
Chippawa Parkway Culvert Replacement | Details |
Portage Road & Prospect Street Sewer Separation | Details |
Marshall Road Bridge Replacement | Details |
Ort Road Bridge Replacement | Details |
Huron Street Road Reconstruction | Details |
Armoury Street Sewer Separation | Details |
Elm Street Sewer Separation | Details |
Homewood Avenue Sewer Separation | Details |
Maple Street Sewer Separation | Details |
Fallsview Boulevard Reconstruction - Phase 2 Construction | Details |
Rideau Street Watermain Replacement | Details |
Schisler Road Bridge Rehabilitation | Details |
Detenbeck Road Bridge Replacement | Details |
Koabel Road Bridge Rehabilitation | Details |
Major Donald Dell Bridge Rehabilitation | Details |
Willowdell Road Bridge Rehabilitation | Details |
Dorchester Road Reconstruction (Oldfield to Mcleod) | Details |
Dorchester/Oldfield Intersection EA & Design | Details |
Dixon Street Sewer Separation (Level Ave. to Orchard Ave.) | Details |
Reixinger Road Watermain Loop and Hospital Servicing | Details |
Mewburn Road Reconstruction - Mountain Road North to City Limits | Details |
Rural Roads Needs Study | Details |
Whirlpool Road Reconstruction - OPG Canal to Stanley Avenue | Details |
Royal Manor Drive Bridge Rehabilitation | Details |
Willick Road Reconstruction - Sodom Rd. to Ort Rd (Design) | Details |
Willick Road Box Culvert Replacement | Details |
2023 Mill & Pave Program | Details |
2023 Road Rehabilitation & Sidewalk Replacement Program | Details |
2023 Asphalt Overlay Program | Details |
Ferry Street Reconstruction - Phase 1 | Details |
2023 Surface Treatment Program | Details |