The City of Niagara Falls uses a pavement information system to determine which streets will be capital improvements in any given year. Pavement conditions, pavement age, traffic volumes, timely maintenance and work are all monitored and ultimately influence the timing and need for road rehabilitation projects.
2024 Budget Year will see 24.6 km of roads rehabilitated / reconstructed through the capital programs including road reconstruction, resurfacing, overlay and restoration programs. That includes 14.4 km of Urban Roads reconstructed and / or resurfaced, and 10.2 km of Rural Roads surface treated. Additionally, 1.3 km of sidewalks and curbs will be replaced.
The streets selected for road improvements have been listed below. The work on each street will take about six to eight weeks from start to finish. Construction will take place in stages and there may be delays between each stage.
Please note that streets could be added to or deleted from the program without prior notice from the City.
Armoury Street
Scope of Work
Between Victoria Ave. and Crysler Ave.
When will the work take place?
Spring / Summer 2023
Associated Project
The following project is associated with this Armoury Street Sewer Separation
Bossert Road
Scope of Work
From King Road to Bossert Service Road
When will the work take place?
Spring / Summer 2024
Associated Project
The following project is associated with this 2024 Surface Treatment Program
Bossert Service Road
Scope of Work
From Bossert Road to Ort Road
When will the work take place?
Spring / Summer 2024
Associated Project
The following project is associated with this 2024 Surface Treatment Program
Cardinal Drive
Scope of Work
From Montrose Road to Thorold Stone Road
Associated Project
The following project is associated with this 2024 Mill & Pave Program
Carl Road
Scope of Work
From Crowland Road to Morris Road
When will the work take place?
Spring / Summer 2024
Associated Project
The following project is associated with this 2024 Surface Treatment Program
Dorchester Road
Dunn Street
Scope of Work
From Ailantus Street to Orchard Avenue
Associated Project
The following project is associated with this 2024 Mill & Pave Program
Durliat Road
Scope of Work
From Montrose Road to Holloway Bay Rd
When will the work take place?
Spring / Summer 2024
Associated Project
The following project is associated with this 2024 Surface Treatment Program
Garner Road
Scope of Work
From McLeod Road to Warren Woods (Hydro Corridor)
Associated Project
The following project is associated with this 2024 Asphalt Overlay Program
Harleyford Crescent
Harleyford Crescent
Lyons Creek Road
Scope of Work
From Mckenney Road to East Limit
When will the work take place?
Spring / Summer 2024
Associated Project
The following project is associated with this 2024 Surface Treatment Program
Macklem Street
Scope of Work
From Portage Road to Mechanic Street
Associated Project
The following project is associated with this 2024 Mill & Pave Program
Marshall Road
Scope of Work
From Beck Road to West Limit
When will the work take place?
Spring / Summer 2024
Associated Project
The following project is associated with this 2024 Surface Treatment Program
Matthews Drive
Scope of Work
From Montrose Road to Mount Carmel Blvd
Associated Project
The following project is associated with this 2024 Mill & Pave Program
Mckenney Road
Scope of Work
From Lyons Creek Road to Yokom Road
When will the work take place?
Spring / Summer 2024
Associated Project
The following project is associated with this 2024 Surface Treatment Program
Morrison Street
Scope of Work
From Stanley Avenue to Valley Way
Associated Project
The following project is associated with this 2024 Mill & Pave Program
Mount Carmel Boulevard
Scope of Work
From Kalar Road to Montrose Road
Associated Project
The following project is associated with this 2024 Mill & Pave Program
Ort Road
Scope of Work
From Bossert Road to Sauer Road
When will the work take place?
Spring / Summer 2024
Associated Project
The following project is associated with this 2024 Surface Treatment Program
Palmer Avenue
Portage Road
Scope of Work
From Norton Street to Macklem Street
Associated Project
The following project is associated with this 2024 Mill & Pave Program
Prospect Street
Rapelje Street
Ridge Road
Scope of Work
From Crowland Road west to tracks
When will the work take place?
Spring / Summer 2024
Associated Project
The following project is associated with this 2024 Surface Treatment Program
Ross Street
Scope of Work
The engineering design for sewer separation, watermain replacement and road reconstruction on Ross Street.
When will the work take place?
Summer 2019
Associated Project
The following project is associated with this Ross Street Sewer Separation - Design
Sarah Street
Scope of Work
From Harleyford Crescent to East Limit
When will the work take place?
Spring / Summer 2024
Associated Project
The following project is associated with this 2024 Road Rehabilitation Program
Swayze Drive
Scope of Work
From Heritage Drive to Stanley Avenue
Associated Project
The following project is associated with this 2024 Mill & Pave Program
Valley Way
Scope of Work
From Drummond Road to Portage Road
Associated Project
The following project is associated with this 2024 Mill & Pave Program
Victoria Avenue
Scope of Work
Clark Avenue to Stanley Avenue. Design of underground sewer and watermain replacements, full road reconstruction with streetscaping, street furniture and LED street lighting.
Associated Project
The following project is associated with this pin oak
Willoughby Drive
Scope of Work
From Detenbeck Road to South Limit
When will the work take place?
Spring / Summer 2024
Associated Project
The following project is associated with this 2024 Surface Treatment Program
Yokom Road
Scope of Work
From Crowland Road to Montrose Road
When will the work take place?
Spring / Summer 2024
Associated Project
The following project is associated with this 2024 Surface Treatment Program
Associated Projects
Project | Details |
---|
pin oak | Details |
Garner Road Sanitary Extension Design - Black Forest Cr to Forestview Bv | Details |
Ross Street Sewer Separation - Design | Details |
Asset Management Plan Update | Details |
Forestview Estates Subdivision Sanitary Sewer and Watermain Upsizing | Details |
Drummond Road Improvements | Details |
Willoughby Drive Reconstruction | Details |
Silvertown Area Functional Servicing Assessment Study | Details |
Marshall Road Bridge Replacement | Details |
Ort Road Bridge Replacement | Details |
Huron Street Road Reconstruction | Details |
Armoury Street Sewer Separation | Details |
Elm Street Sewer Separation | Details |
Homewood Avenue Sewer Separation | Details |
Maple Street Sewer Separation | Details |
Rideau Street Watermain Replacement | Details |
Schisler Road Bridge Rehabilitation | Details |
Detenbeck Road Bridge Replacement | Details |
Koabel Road Bridge Rehabilitation | Details |
Major Donald Dell Bridge Rehabilitation | Details |
Willowdell Road Bridge Rehabilitation | Details |
Dorchester Road Reconstruction (Oldfield to Mcleod) | Details |
Dorchester/Oldfield Intersection EA & Design | Details |
Dixon Street Sewer Separation (Level Ave. to Orchard Ave.) | Details |
Reixinger Road Watermain Loop and Hospital Servicing | Details |
Mewburn Road Reconstruction - Mountain Road North to City Limits | Details |
Rural Roads Needs Study | Details |
Whirlpool Road Reconstruction - OPG Canal to Stanley Avenue | Details |
Royal Manor Drive Bridge Rehabilitation | Details |
Willick Road Reconstruction - Sodom Rd. to Ort Rd (Design) | Details |
Willick Road Box Culvert Replacement | Details |
Ferry Street Reconstruction - Phase 1 | Details |
2024 Asphalt Overlay Program | Details |
2024 Sidewalk Replacement Program | Details |
2024 Road Rehabilitation Program | Details |
2024 Mill & Pave Program | Details |
2024 Surface Treatment Program | Details |