The City of Niagara Falls uses a pavement information system to determine which streets will be capital improvements in any given year. Pavement conditions, pavement age, traffic volumes, timely maintenance and work are all monitored and ultimately influence the timing and need for road rehabilitation projects.

2023 Budget Year will see 11.5km of roads rehabilitated through the capital programs that include road resurfacing, overlay and restoration programs. That includes 7.2 km of Urban Roads reconstructed and / or resurfaced, and 4.3 km of Rural Roads surface treated. Additionally, 1.4 km of sidewalks and curbs will be replaced.

The streets selected for road improvements have been listed below. The work on each street will take about six to eight weeks from start to finish. Construction will take place in stages and there may be delays between each stage.

Please note that streets could be added to or deleted from the program without prior notice from the City.

Armoury Street

Scope of Work

Between Victoria Ave. and Crysler Ave.

When will the work take place?

Spring / Summer 2023

Associated Project

The following project is associated with this  Armoury Street Sewer Separation

Baker Road

Scope of Work

From Willoughby Dr to QEW

When will the work take place?

Spring/Summer 2023

Associated Project

The following project is associated with this  2023 Surface Treatment Program

Brown Road

Scope of Work

From Beachwood Rd to Townline Rd

When will the work take place?

Spring/Summer 2023

Associated Project

The following project is associated with this  2023 Surface Treatment Program

Butler Place

Associated Project

The following project is associated with this  2023 Road Rehabilitation & Sidewalk Replacement Program

Carlton Avenue

Scope of Work

50 meters North of Dunn Street towards Corwin Crescent to Our Lady of Mount Carmel School

When will the work take place?

Spring/Summer 2023

Associated Project

The following project is associated with this  2023 Surface Treatment Program

Church's Lane

Scope of Work

From St. Paul Avenue to Portage Road

Associated Project

The following project is associated with this  2023 Mill & Pave Program

Cropp Street

Scope of Work

From Dorchester Road to Pettit Avenue

When will the work take place?

Spring / Summer 2023

Associated Project

The following project is associated with this  2023 Asphalt Overlay Program

Empire Place

Associated Project

The following project is associated with this  2023 Road Rehabilitation & Sidewalk Replacement Program

Garner Road

Scope of Work

From Hendershot Blvd to Beaverdams Rd

When will the work take place?

Spring/Summer 2023

Associated Project

The following project is associated with this  2023 Surface Treatment Program

Heritage Drive

Scope of Work

From Swayze Street to Stanley Avenue

When will the work take place?

Spring / Summer 2023

Associated Project

The following project is associated with this  2023 Road Rehabilitation & Sidewalk Replacement Program

Kalar Road

Scope of Work

From Brown Road to McLeod Road

Associated Project

The following project is associated with this  2023 Asphalt Overlay Program

Loyalist Avenue

Scope of Work

From Heritage Drive to Church's Lane

Associated Project

The following project is associated with this  2023 Road Rehabilitation & Sidewalk Replacement Program

North Street

Scope of Work

Between Portage Road and Drummond Road

When will the work take place?

Spring/Summer 2023

Associated Project

The following project is associated with this  2023 Surface Treatment Program

O'neil Street

Scope of Work

From Portage Road to Dorchester Road

When will the work take place?

Spring / Summer 2023

Associated Project

The following project is associated with this  2023 Mill & Pave Program

Ort Road

Scope of Work

From Weaver Rd to Marshall Rd

When will the work take place?

Spring/Summer 2023

Associated Project

The following project is associated with this  2023 Surface Treatment Program

Pettit Avenue

Scope of Work

From Cropp Street to dead end

Associated Project

The following project is associated with this  2023 Asphalt Overlay Program

Portage Road

Scope of Work

From Thorold Stone Road to O'Neil Street

When will the work take place?

Spring / Summer 2023

Associated Project

The following project is associated with this  2023 Mill & Pave Program

Ross Street

Scope of Work

The engineering design for sewer separation, watermain replacement and road reconstruction on Ross Street.

When will the work take place?

Summer 2019

Associated Project

The following project is associated with this  Ross Street Sewer Separation - Design

Secord Place

Associated Project

The following project is associated with this  2023 Road Rehabilitation & Sidewalk Replacement Program

St James Avenue

Scope of Work

From Colborne Street to St. John Street

Associated Project

The following project is associated with this  2023 Asphalt Overlay Program

St Peter Avenue

Scope of Work

From Colborne Street to St. John Street

Associated Project

The following project is associated with this  2023 Asphalt Overlay Program

Stamford Green Drive

Scope of Work

From St. Paul Avenue to St. George Avenue

Associated Project

The following project is associated with this  2023 Mill & Pave Program

Victoria Avenue

Scope of Work

Clark Avenue to Stanley Avenue. Design of underground sewer and watermain replacements, full road reconstruction with streetscaping, street furniture and LED street lighting.

Associated Project

The following project is associated with this  pin oak

Weinbrenner Road

Scope of Work

From Willoughby Drive to East limit

Associated Project

The following project is associated with this  2023 Asphalt Overlay Program

Willoughby Drive

Scope of Work

From Weinbrenner Rd to Marshall Rd

When will the work take place?

Spring/Summer 2023

Associated Project

The following project is associated with this  2023 Surface Treatment Program

Willoughby Drive

Scope of Work

200 meters south of Weinbrenner Road to Marshall Road

When will the work take place?

Spring/Summer 2023

Associated Project

The following project is associated with this  2023 Surface Treatment Program

Associated Projects

ProjectDetails
pin oak Details
Garner Road Sanitary Extension Design - Black Forest Cr to Forestview BvDetails
Ross Street Sewer Separation - DesignDetails
Asset Management Plan UpdateDetails
Forestview Estates Subdivision Sanitary Sewer and Watermain UpsizingDetails
Beck Road Bridge ReplacementDetails
Drummond Road ImprovementsDetails
Main Street Chippawa Road Reconstruction & Storm Sewer ReplacementDetails
Willoughby Drive ReconstructionDetails
Banting Avenue & Roosevelt Avenue Sanitary Sewer and Watermain ReplacementDetails
Fern Avenue, Marieclaude Avenue & Jordan Avenue Watermain ReplacementDetails
Victoria Avenue BridgeDetails
Silvertown Area Functional Servicing Assessment StudyDetails
Chippawa Parkway Culvert ReplacementDetails
Portage Road & Prospect Street Sewer SeparationDetails
Marshall Road Bridge ReplacementDetails
Ort Road Bridge ReplacementDetails
Huron Street Road ReconstructionDetails
Armoury Street Sewer SeparationDetails
Elm Street Sewer SeparationDetails
Homewood Avenue Sewer SeparationDetails
Maple Street Sewer SeparationDetails
Fallsview Boulevard Reconstruction - Phase 2 ConstructionDetails
Rideau Street Watermain ReplacementDetails
Schisler Road Bridge RehabilitationDetails
Detenbeck Road Bridge ReplacementDetails
Koabel Road Bridge RehabilitationDetails
Major Donald Dell Bridge RehabilitationDetails
Willowdell Road Bridge RehabilitationDetails
Dorchester Road Reconstruction (Oldfield to Mcleod)Details
Dorchester/Oldfield Intersection EA & DesignDetails
Dixon Street Sewer Separation (Level Ave. to Orchard Ave.)Details
Reixinger Road Watermain Loop and Hospital ServicingDetails
Mewburn Road Reconstruction - Mountain Road North to City LimitsDetails
Rural Roads Needs StudyDetails
Whirlpool Road Reconstruction - OPG Canal to Stanley AvenueDetails
Royal Manor Drive Bridge RehabilitationDetails
Willick Road Reconstruction - Sodom Rd. to Ort Rd (Design)Details
Willick Road Box Culvert ReplacementDetails
2023 Mill & Pave ProgramDetails
2023 Road Rehabilitation & Sidewalk Replacement ProgramDetails
2023 Asphalt Overlay ProgramDetails
Ferry Street Reconstruction - Phase 1Details
2023 Surface Treatment ProgramDetails