Detenbeck Road Bridge Replacement

Project Description

The existing bridge structure on Detenbeck Road between Sodom Road and Willoughby Drive was identified as needing replacement due to deteriorated conditions as part of our bi-annual Bridge and Culvert inspection program. The design was approved in 2021 with the construction planned for 2024.

Project Cost

YearAmount
2021$45,000
2024$640,000

Project Schedule

2021-2024

Project Contact

Nick Golia
Senior Project Manager - Development