Detenbeck Road Bridge Replacement
Project Description
The existing bridge structure on Detenbeck Road between Sodom Road and Willoughby Drive was identified as needing replacement due to deteriorated conditions as part of our bi-annual Bridge and Culvert inspection program.
The design was approved in 2021 with the construction planned for 2024.
Project Cost
Year | Amount |
---|
2021 | $45,000 |
2024 | $640,000 |
Project Schedule
2021-2024
Project Contact
Nick Golia
Senior Project Manager - Development