Detenbeck Road Bridge Replacement

Project Description

The existing bridge structure on Detenbeck Road between Sodom Road and Willoughby Drive was identified as needing replacement due to deteriorated condition as part of our bi-annual Bridge and Culvert inspection program. It is intended to complete the design in 2021 for potential construction in 2022.

Project Cost

YearAmount
2021$345,000

Project Schedule

2021

Project Contact

Nick Golia
Senior Project Manager - Development
905-356-7521 ext 4290