Detenbeck Road Bridge Replacement
Project Description
The existing bridge structure on Detenbeck Road between Sodom Road and Willoughby Drive was identified as needing replacement due to deteriorated condition as part of our bi-annual Bridge and Culvert inspection program.
It is intended to complete the design in 2021 for potential construction in 2022.
Project Cost
Project Schedule
2021
Project Contact
Nick Golia
Senior Project Manager - Development
905-356-7521 ext 4290