Public Notices

  • (CANCELED) Notice of Public Meeting - 5901-6009 Bentley Common - AM- 2024-023 - Minor Zoning By-Law Amendment Application

    Description

    A Minor Zoning By-law Amendment application has been submitted to permit Vacation Rental Units (VRUs) on the subject lands (5901-6009 Bentley Common). Schedule 1 shows the details of the proposed development. The subject lands are designated Minor Commercial in part, and Residential in part, in accordance with the City of Niagara Falls Official Plan.

    The subject lands are zoned Residential Low Density Grouped Multiple Dwelling (R3-916) Zone, as amended by By-law Nos. 2010-131 and 2016-111. In February of 2024, the Committee of Adjustment approved a Minor Variance application to allow 7 of the 34 townhouse dwellings (5957-5981 Bentley Common) to be used as VRUs in addition to the existing residential uses. The current Minor Zoning By-law Amendment application (AM-2024-

    023) proposes to extend this use for the remaining 27 townhouse dwellings so that all 34 townhouse dwellings may be used as VRUs, as seen in plans. 

    Digital copies of plans and documents submitted with the application may be obtained on the Planning Department Current Applications webpage.

    Posting Dates

    10/18/2024 to 11/21/2024
  • Notice of Public Meeting - 4952 Walnut Street - AM- 2024-025 - Minor Zoning By-Law Amendment Application

    Description

    A Minor Zoning By-law Amendment application has been submitted to permit one (1) Vacation Rental Unit (VRU) and to address existing zoning deficiencies. Schedule 1 shows the details of the proposal. The subject lands are designated Tourist Commercial in accordance with the City of Niagara Falls Official Plan.

    The subject lands are currently zoned Deferred Tourist Commercial (DTC-75) under Zoning By-law 79-200, as amended by By-law Nos. 2012-60 and 2012-61. The applicant is requesting to rezone the lands to a Site-Specific Deferred Tourist Commercial Zone to add a VRU as a permitted use and to address deficiencies in minimum lot area, minimum lot frontage, minimum rear yard depth, and interior side yard width.

    Digital copies of plans and documents submitted with the application may be obtained on the Planning Department Current Applications webpage.

    Posting Dates

    10/18/2024 to 11/21/2024
  • Notice of Council Meeting- Revision from Delegated Meeting Notice - 3151 Montrose Road and a vacant parcel to the north - Draft Plan of Subdivision

    Description

    A Draft Plan of Subdivision has been submitted to permit 1 large block Draft Plan of Subdivision and 5 blocks for a Common Elements Condominium (CEC).

    The CEC will create the common road and visitor parking area, 2 blocks for 9 townhouse dwelling units, and 2 detached dwelling blocks with the remaining lot that will be created north of the plan of subdivision. The future individual lots for the townhouse units will be created through part lot control. Schedule 1 and Schedule 2 shows details of the proposed Draft Plan of Subdivision and Common Elements Condominium.


    The land is currently zoned Residential Low Density Grouped Multiple Dwelling (R4-1227) under Zoning By-law 79-200, as amended as amended by By-law No. 2024-002. The proposed draft plan of subdivision and common elements condominium comply with the zoning regulations. See the attached notice for more details.

    Digital copies of plans and documents submitted with the application may be obtained on the Planning Department Current Applications
    webpage.

    Posting Dates

    10/11/2024 to 11/13/2024
  • Notice of Application & Open House Meeting - 7302 Kalar Road - AM-2024-011 - Official Plan & Zoning By-law Amendment Application

    Description

    An Official Plan and zoning by-law amendment application has been submitted to permit the development of two buildings-- one 13 storey apartment building and one 15 storey apartment building with a total of 412 apartment dwelling units.  The attached shows details of the proposed development. 

    The City's Official Plan designates the land as Residential, in part, and Environmental Protection Area, in part.  It is designated as Mixed Use, in part, and Environmental Protection Area, in part,  under the Garner South Secondary Plan.  A maximum height of 6 storeys and maximum density of 75 units per hectare are permitted.  The application requests a Special Policy Area designation to redesignate the lands to Residential, High Density (which permits a maximum height of 8 storeys and a maximum density of 125 units per hectare), in part, and amend the portion of lands designated Environmental Protection Area, in part; to allow the residential portion of the land to be developed with apartment buildings with a maximum height of 15 storeys and a maximum density of 319 units per hectare.

    The land is zoned Light Industrial (LI) under By-law 79-200, as amended.  The applicant is requesting to place the lands under the Residential Apartment 5F Density (R5F) Zone with reduced minimum lot area, minimum rear yard and minimum interior side yard setbacks, parking requirements, and landscaped open space; increased maximum lot coverage and maximum height; and, to permit two apartment dwellings on one lot.

    Digital copies of plans and documents submitted with the application may be obtained on the Planning Department Current Applications webpage.

    Posting Dates

    10/4/2024 to 11/5/2024
  • Town of Niagara-on-the-Lake, Portage Road Temporary Road Closure

    Description

    Motorists and the general public are hereby advised that Regional Road 61 (Portage Road) between Niagara River Parkway and Regional Road 102 (Stanley Avenue) will be closed to through traffic between September 3rd, 2024, to November 29th, 2024. 

    The road closure is necessary for the detour of motorists off of Highway 405. The detour route for the closure is as follows: 

    D1 (Eastbound): Regional Road 61 (Niagara Townline Road) > Regional Road 100 (Four Mile Creek Road) > Regional Road 81 (York Road) > Niagara River Parkway 

    D2 (Westbound): Niagara River Parkway > Regional Road 81 (York Road) > Regional Road 100 (Four Mile Creek Road) > Regional Road 61 (Niagara Townline Road) 

    Emergency Services will have through access during the closure. 

    Any inquiries concerning this closure may be directed to Kevin Allan at (905) 980-6000 ext. 3267. 

    Your co-operation and patience during this period of inconvenience will be appreciated. 

    Please follow the public-facing website for Niagara Region Road closures www.Municipal511.ca for real-time information on road closures and construction updates. Municipal 511 share road information that connected directly to Google Maps and Waze and help Niagara Region, Local Area Municipalities and MTO to better coordinate local construction projects to minimize traffic disruption. 

    Terry Ricketts,

    P.Eng. ,Commissioner of Public Works Niagara Region

    Posting Dates

    9/3/2024 to 11/29/2024
  • Notice of Construction - Armoury Street Sewer Separation - St. Lawrence Avenue Sewer Separation & Watermain Replacement

    Description

    City Contract 2024-531-20 (Phase 2)
    Armoury Street Sewer Separation (Victoria Avenue to St. Lawrence Avenue)
    St. Lawrence Avenue Sewer Separation and Watermain Replacement (Simcoe Street to Jepson Street)

    The City of Niagara Falls will be conducting various infrastructure improvements on Armoury Street and St. Lawrence Avenue including new sanitary, storm sewers, watermain (St. Lawrence Ave), full depth road reconstruction including new curbs and sidewalks.

    This contract will be carried out for the City of Niagara Falls by Alfidome Construction Niagara. Construction is scheduled to begin the week of July 15, 2024. Please note that the actual start date will be dependent on weather and the acquisition of all necessary permits and approvals.

    For further information you may contact:

    Kurtis Bottrell, C.E.T.
    Project Manager, Municipal Works
    City of Niagara Falls
    4310 Queen Street
    Niagara Falls, ON L2E 6X5
    Phone: 905-356-7521, Ext. 4338
    Email: [email protected]

    Attachments

    Posting Dates

    7/10/2024 to 12/31/2024
  • Notice of Commencement - Portage Trunk Sewer Rehabilitation

    Description

    Niagara Region is carrying out the preliminary and detailed design of improvements to the Portage Trunk Sewer, located in the City of Niagara Falls.

    The Portage Trunk Sewer is located along a hydro corridor between the rear yards of Sheldon Street and Darcy Crescent / Maplewood Avenue. Sewage is discharged from the Kalar Road Sewage Pumping Station into the trunk sewer at an access chamber located south of the rear fence line at 6606 Sheldon Street. The sewer continues eastward for approximately 1.3 kilometers before discharging to the Stamford Interceptor and ultimately the Niagara Falls Wastewater Treatment Plant.

    The detailed design is anticipated to be completed by winter 2025.

    Visit the project webpage at https://www.niagararegion.ca/projects/portage-trunk-sewer-rehabilitation/default.aspx for further details as the design progresses. 

    Any questions about this project should be directed to:

    Robert Stret, P.Eng. PMP
    Project Manager, Water and Wastewater Engineering
    Niagara Region
    905-980-6000 ext. 3190
    [email protected]

    Patrick Moskwa
    Project Manager
    Robinson Consultants
    905-304-0080 ext. 225
    [email protected]

    Posting Dates

    7/4/2024 to 12/31/2025
  • Notice of Construction - Phase 2 Ferry Street Reconstruction

    Description

    Please be advised that construction is scheduled to recommence on Ferry Street from Stanley Avenue to Clark / Ellen Avenue on September 3rd.

    Provincial Construction Inc. will be performing road reconstruction including underground infrastructure replacements, new curbs and sidewalks, decorative street lighting, and landscaping for the City of Niagara Falls on the following streets:

    Ferry Street from Stanley Avenue to Clark / Ellen Avenue
    Buchanan Avenue from Spring Street to Ferry Street

    The project will be completed over two separate construction periods as follows:

    Period 1: April 22nd to June 28th, 2024
    Period 2: September 3rd to November 29th, 2024

    There are no planned road closures on Ferry Street.  The contractor intends to keep traffic flowing in both directions during and after working hours with only a few exceptions where traffic will need to be squeezed down to one lane with flag persons when crossing the street for electrical services and for a storm sewer connection at Buchanan Avenue / Ferry Street.

     There is a planned road closure on Buchanan Avenue from Spring Street to Ferry Street to complete some storm sewer work.  It is expected that this closure will be implemented mid-late September and will last approximately three weeks, weather permitting.

     Watermain connections need to be completed in the Stanley Avenue intersection.  This work will be completed at night to minimize disruptions.

    In accordance with the contract documents, the contractor, Provincial Construction Inc. is required to notify emergency services of their daily operations.

    The work is scheduled to commence on September 3rd, 2024 with completion expected by the end of November 2024, weather permitting.

    For further information you may contact:

    Eric Lallouet
    Senior Project Manager
    Municipal Works, City of Niagara Falls
    4310 Queen Street, P.O. Box 1023
    Niagara Falls, ON L2E 6X5
    (905) 356-7521 ext. 4216
    [email protected]

    Attachments

      Posting Dates

      4/11/2024 to 11/29/2024
    • Hydrant Flushing - 2024

      Description

      The City of Niagara Falls fire hydrant flushing program began on April 2, 2024, and will continue on into the fall of 2024. This is performed as part of a scheduled preventative maintenance program to help maintain good water quality and to improve water flow in your neighbourhood. The flushing will be moving to the areas bordered by TSR, Dorchester Rd, North Limit and East Limit (see map for further detail). If you reside in this area, you may notice a temporary decrease in your water pressure and may experience discoloured water. If discolouration occurs, running a cold water tap closest to your water meter for a short period of time should alleviate the problem. Should you have any questions, concerns or persistent issues, please contact the Municipal Service Centre at 905-356-1355. The City’s Annual Water Report can be viewed online at www.niagarafalls.ca or in person at the Municipal Service Centre at 3200 Stanley Avenue

       

       

       

       

       

       

       

       

       

       

      Posting Dates

      4/2/2024 to 11/30/2024
    • Notice of Construction - Main Street (Chippawa) Road Reconstruction (Sodom Road to Dock Street)

      Description

      The City of Niagara Falls will be conducting various infrastructure improvements on Main Street Chippawa including new sanitary and storm sewers, full depth road reconstruction, new sidewalks, bicycle lanes, driveways, curbs, and boulevards on;

      Main Street Chippawa (Dock Street to Oliver Street)
      Main Street Chippawa (Oliver Street to Sodom Road)

      This contract will be carried out for the City of Niagara Falls by Baiocco Construction Corp

      At times it may be difficult to drive through the above location due to construction progress. Due to the scope of the work involved, Main Street Chippawa may be limited to one side of pedestrian traffic at times. Driveway accessibility will be affected periodically during sidewalk construction with every effort being made to give advance notice as these restrictions are implemented

      Construction is tentatively scheduled to commence on April 9, 2024, and will be continuous until completion, approximately November 2024 weather and supplies permitting.

      Two lanes of traffic will be maintained whenever possible. Rolling road closures of Main Street Chippawa are expected within the various stages of construction during the sanitary sewer and storm sewer installation. The timing and limits of all road closures will be provided in advance.

      For further information you may contact:              

      Wendy Eitzen, P.Eng.
      Project Manager, Municipal Works
      City of Niagara Falls
      Phone: 905-356-7521, Ext. 4337
      Email: [email protected]

      Attachments

        Posting Dates

        3/26/2024 to 11/30/2024
      • QEW Burlington Skyway Southbound Lane Structural Rehabilitations & NB and SB Electrical Work (GWP 2385-15-00)

        Description

        The Ontario Ministry of Transportation (MTO) has retained WSP Canada Inc. (WSP) to undertake the Detail Design and Class Environmental Assessment Study (Class EA) for the structural rehabilitations of the Queen Elizabeth Way (QEW) Burlington Skyway southbound lane and the completion of electrical work on both the northbound and southbound QEW, within the City of Hamilton
        and the City of Burlington.

        The Burlington Skyway Niagara Bound structure will be rehabilitated in three main stages with all four lanes maintained during daytime and nightly lane closures as required. During each stage there will be single lane closures on the QEW throughout the weekends (Friday Night to Monday morning, approximately eight weekends per construction season) to rehabilitate the middle portions of the deck. Three lanes will be maintained over the Skyway structure during these weekend lane closures. Construction is expected to last for 3 years, and is anticipated to start in Spring 2024 with completion by Fall 2026.

        Please note that www.511on.ca is also a great resource for travel, construction/maintenance closures and activities on the provincial highways.

        If you wish to obtain additional information or provide comments, please contact one of the Project Team members listed below:

        Ben Hui, P.Eng., M. Eng.

        Senior Project Manager - WSP Canada Inc.

        6925 Cenury Ave, Floor 6,

        Mississauga, ON L5N 7K2

        Tel: 289-835-2506

        e-mail: [email protected]

        Alice Kam. P.Eng

        Senior Project Manager

        Ontario Ministry of Transportation

        159 Sir William Hearst Ave. 4th Floor

        Downsview, ON M3M 0B7

        Tel: 437-227-5587

        e-mail: [email protected]

        Attachments

          Posting Dates

          10/23/2023 to 10/23/2026